Fencing

Garden fencing

Straight, level and properly set fencing — panel, closeboard or feature.

A good fence line starts with proper posts, set plumb and concreted in. I run the string line first so the whole fence is straight, then work along the run — old fence out, new fence in, no gaps at the bottom and no leaning panels.

What's included

  • Removal of old fencing and posts
  • Concrete or timber post installation (concreted in)
  • Panel, closeboard or trellis fencing
  • Gravel boards and post caps
  • Gates and gate posts where required
  • Clean removal of old materials

How the work runs

  1. 1

    Send photos of the fence line

    One photo along the run and one from the end.

  2. 2

    Quote back

    Options for post type (timber vs concrete) and panel style.

  3. 3

    Line set and posts in

    Old fence out, string line set, posts concreted and left to set.

  4. 4

    Panels and finish

    Panels dropped in, gravel boards fitted, caps on, offcuts cleared.

Timing: A typical rear garden run of 10–15m is done in 1–2 working days plus setting time for concrete.

Frequently asked questions

  • Concrete lasts much longer, especially in wet ground. Timber is cheaper but will rot at the base in 5–10 years. I recommend concrete on most jobs.

Free quote

Ready to start your project?

Send a few photos on WhatsApp and get a free quote today.

Get a Free Quote on WhatsApp
WhatsApp Free Quote